Application control matters of vibrating rammer

2021-12-07

1) Please ensure that all pipes are properly installed, allVibration rammerThe oil return lines are fully extended.

2) Please ensure that the oil flow rate and applied working pressure are properly adjusted.

3) Turn on the tamper. Please place the tamper on the object to be rammed, and within the first 10-20 seconds, make sure to apply a small amount of pressure

Different application working pressure can be selected according to the unnecessary ramming objects.

4) Continuously apply large and small forces during vibrating tamping. First apply a mild tamping force, and then apply a slightly larger tamping force. Continuously carry out. Please do not tamper too much, beyond the bearing capacity.

When tamping granular objects, the tamper can be raised to a relative height of 0.5-1 meters. For sticky objects, it can be less than this relative height.

When rammed earth is rammed, moisture content is a major factor.

The filling system, which is widely certified and accepted, is a deflection process. The material is filled in one area and the corners of its reflection are allowed to be sought. The ramming also starts from this side, but above the pipe. All the material Fill in this corner. The tamper plate moves left and right along this reflection corner. In this way, the filler and the compressor can be very close to the operator. When the pipe is installed, it can be quickly re-laid 1 Floor.

After the daily work is completed, it is not necessary to put the objects loaded by the vibrating rammer into the vibrating frame for the night. When storing, twist the tamping plate to the side or the bottom of the equipment. When storing, twist the tamper to the side or the bottom of the equipment.