Banner

news

Home>news>Content

Operating instructions for vibrating rammers

2021-07-19

  Vibration rammeroperating instructions for

1) Please ensure that any pipes are properly installed and any oil hole routes are fully spread out.

2) Please ensure that the oil flow rate and operating pressure are properly adjusted.

3) Turn on the tamper. Please place the tamper on the object to be rammed, and make sure to use a small working pressure within the first 10-20 seconds. You can choose different applications according to the unnecessary ramming objects work pressure.

4) In the case of tamping, use the dimensional force alternately. First use a mild tamping force, then use a slightly larger tamping force. Keep changing and developing. Please do not tamper too much, beyond the bearing capacity.

When tamping particulate chemicals, the tamper can be pulled up to a height of 0.5-1 meters. For viscous chemicals, it can be less than this height.

When ramming soil, moisture content is a major factor.

The widely proven filling system is a type of tilting technique. The material is filled in an area and it is allowed to find the corner where it reacts. The ramming also starts from this angle, but above the tube. Any material is filled into this corner. The tamper plate is moved up and down along this reaction angle. In this way, the filler and compressor can be kept very close to the operator. When the pipe is placed, a layer can be quickly applied.

After the work task, it is not necessary to put the loaded objects in the vibrating frame for the night. When storing, twist the compacting plate to the side or the bottom of the machine. When storing, twist the compacting plate to the side or the bottom of the machine. .

Damage caused by improper use of hydraulic hammer?

Operation inspection of breaker