How to properly maintain and use the hydraulic hammer during the running-in period

2020-07-20

  Hydraulic hammerThe use skills and maintenance during the running-in period are very critical. The hammer generally has a running-in period of about 60 hours after leaving the factory. The running-in period is an important link to reduce the failure rate, ensure the normal operation of the equipment, and extend the service life of the equipment. Let's take a look at the maintenance and use skills of the product during the running-in period.

1. Pay attention to the work load during the running-in period. The working load during the running-in period should generally not exceed 80% of the rated working load.

2. Pay attention to frequently observe the indications and abnormal conditions of the instrument. Once a failure occurs, stop disassembly in time, and stop operation before the failure is resolved.

3. Since the hydraulic hammer is a professional equipment, the operator should receive training and guidance from the manufacturer before operation, fully understand the structure and performance of the machine, and obtain certain operation and maintenance experience. The product use and maintenance manual provided by the manufacturer is the data necessary for the operator to operate the equipment. The operator must read the operation and maintenance manual before operating the machine, and perform operation and maintenance in accordance with the requirements of the manual.

4. Pay attention to checking the level and quality of lubricating oil, hydraulic oil, coolant, brake fluid and fuel (water), and pay attention to checking the sealing of the whole machine. If there is less oil and water during the inspection, the reason should be analyzed and the lubrication of each lubrication point should be strengthened. During the running-in period, try to refuel at the lubrication point every time you change shifts.

5. Keep the hydraulic hammer clean, adjust and tighten the loose parts in time, so as not to aggravate the wear of the parts or cause the parts to be lost due to looseness.

6. After the end of the operating cycle, the machine must be maintained, inspected and adjusted compulsorily, and the oil must be replaced.

The above is the use and maintenance skills of the hydraulic hammer during the running-in period. For any equipment, the running-in period is a very important period. The running-in situation in this period has a great influence on the future use of the equipment.