The process of stopping the operation of the breaker of the photovoltaic pile driver

2020-07-20

The photovoltaic piling hammer is currently a widely used equipment. Its appearance greatly liberates manpower, reduces construction costs to a large extent, and improves construction efficiency and schedule. Do you know this kind of equipment? Do you know how to close it after the job is finished? Simply turn off the switch? Obviously, it is not that simple. The following editor will introduce you to the process of stopping operations.

1. Move the speed control handle of the photovoltaic piling hammer diesel engine to the idle position, first let the diesel engine run at low speed and no load for 5 minutes, and then move the speed control handle to the parking position, and the diesel engine can be stopped. ;

2. Turn off the switch of the diesel tank (if it is winter, the cold water in the machine needs to be discharged to prevent freezing and cracking);

3. Remove the flexible shaft between the main engine and the power unit, and put the winding shaft in place at the same time;

4. Take the host out of the heap;

5. Carefully check the main engine and power plant (including diesel engine), and make daily maintenance records.

The above is the operation process of stopping the operation of the photovoltaic piling hammer. For any equipment, maintenance is very important, but it is also very important to use it carefully. The more carefully we treat it, it will be damaged. The smaller the probability, the higher the service life. Our company is a professional manufacturer of breakers. The products include hydraulic breakers, quick connectors, rippers, vibratory rammers, pile drivers, etc. Our company has many years of experience in the industry, and has its own unique products in product design and production. If you have relevant needs, please call for consultation.